For rail
Plan PTS medicals and D&A renewals before Sentinel blocks them
Sentinel decides at the swipe-in. It doesn't plan for you. Certly is the layer next to it, for rail labour suppliers and sponsors: every medical, screening and competence date in your own overview, with reminders months ahead — so the renewal is booked long before the card would ever block.
The dates behind a Sentinel card
- PTS medicals — Validity depends on age: broadly 10 years under 40, 6 years under 50, 5 years under 60 and 1–2 years beyond that. A crew of mixed ages means medicals expiring on completely different rhythms.
- Drugs & alcohol status — A negative screen no older than three months is required before initial PTS training, and random testing continues throughout. A positive result cancels the Sentinel card and bars the individual from Network Rail infrastructure for five years — there is no fixing that one afterwards.
- Competences on the card — PTS itself and every additional competence carries its own recertification date in Sentinel. The card swipes green until the day one of them lapses.
- Everything Sentinel doesn't hold — The rest of the wallet still exists: first aid, plant tickets like forklift or IPAF for depot work, driving licences, and your own company paperwork for RISQS audits.
Where it goes wrong in practice
Sentinel tells you at the gate, not in advance. The system of record is exactly that — a record. It answers "is this person compliant right now?" flawlessly, at the moment they swipe in for a night shift. By then your options are zero: the shift is short-handed and the client knows it before you do.
Age bands make medicals unpredictable. One operative renews his PTS medical every ten years, his older colleague every two. No single rhythm to remember means no rhythm at all — each date has to be tracked individually.
The sponsor duty is yours, not Sentinel's. The Sentinel Scheme Rules expect sponsors to run a competence management system that flags requirements in advance of expiry. A spreadsheet that someone checks when it's quiet doesn't meet the spirit of that — and it shows exactly when it matters, at an audit or after an incident.
The rest of the wallet lives nowhere. Sentinel holds the rail competences. The first aid certificate, the depot forklift ticket and the driving licence live in a drawer — until a client asks for the full matrix at pre-qualification.
How it works with Certly
- Reminders at 90, 60 and 30 days before every medical, screening and competence date — with escalation at 14 and 7 days if nothing has been booked.
- Working back from the date — 90 days is enough to book the medical provider, release the operative for a day and get the result uploaded to Sentinel with room to spare.
- The operative gets their own email, with a link to confirm the new date from their phone — no login. If it sits, it escalates to you.
- One matrix for everything — rail dates next to first aid, IPAF and forklift tickets for depot work, plus vehicles and plant.
- Evidence on one button — a status overview with underlying documents as a PDF, or a live share link, for the RISQS audit or the client's pre-qualification.
- Requirements per client (Pro) — record what each principal contractor demands and see green, amber or red per operative, tested through the job's end date, before you confirm the shift.
Start without retyping anything
Most suppliers already have the dates in a spreadsheet — it goes into Certly in one upload. Starting from scratch? The free training matrix template gives you the structure, and you can import that same file later.
Frequently asked questions
Does Certly replace Sentinel?
No — and it doesn't try to. Sentinel is Network Rail's system of record: it holds the card, the competences, the medical and D&A status, and it decides at the swipe-in. Certly is the planning layer on your side of that system: it tracks the same dates in your own overview and warns you 90, 60 and 30 days ahead, so a renewal is booked long before Sentinel ever has a reason to block.
How do rail labour suppliers plan PTS medicals and D&A renewals?
By working back from the expiry date: medical providers need booking weeks ahead, the operative needs a day released, and the result needs uploading against their Sentinel profile. Because medical validity depends on age — from 10 years for the under-40s down to 1–2 years for over-60s — a mixed crew expires on completely different rhythms, which is why this belongs in a system rather than a spreadsheet someone checks when it's quiet.
What does the Sentinel scheme expect from sponsors?
The Sentinel Scheme Rules require sponsors to have a competence management system that flags their people's training, assessment and mentoring requirements in advance of expiry. In other words: being surprised by an expiry date isn't just expensive, it's a gap in the system you signed up to have. Certly is a straightforward way to be that system for a small or mid-sized supplier.
What does a blocked operative actually cost?
The shift, first of all: rail work is planned tightly and often at night, so a blocked card at the access point means a possession going short-handed and a client ringing you at 02:00. After that it costs trust — a labour supplier is hired precisely so that this doesn't happen. And a failed D&A is a different category altogether: five years off Network Rail infrastructure.
Does this work for a small labour supplier?
Yes — it's built for that size. Certly starts at £21.95 a month, billed in pounds, for up to 25 people, vehicles and machines, with documents always unlimited. That's less than the margin on a single shift. The full price list is at gocertly.com/uk/pricing.
Never lose a shift to a blocked card
Put your operatives into Certly in ten minutes and let every medical, screening and competence date watch itself. From €24.95 a month — see all pricing.
Working construction sites as well? See Certly for construction.